Garden-fresh finds · Free shipping over $65 · Browse the beds

01-13: Circulating Water Flow Measurements - A Study Manual The successful completion of cooling

SKU: 53043132678

4.4
USD20.00 USD60.00

Pay in 4 interest-free payments of $5.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 31 - Sep 5

Description

The successful completion of cooling tower construction and repair projects depends on the proper execution of many activities at the proper time

plus that on the waterside

customer requirements

CleanAir Engineering was contracted by the Cooling Technology Institute to conduct research regarding the suitability of two new candidate pitot designs for water flow rate measurements

The main target of these R&D efforts was and is the improvement of the evenness of water distribution in cooling towers and consequentially the overall cooling performance

01-13: Circulating Water Flow Measurements - A Study Manual The successful completion of coolingThis study compares the effect that measurement locationhas on flow determination using different measurement techniques. Three different flow measurement techniques used are the Pitot tube, a transit time sonic flow meter and a dyedilution technique. Measurements are taken in the main header, the risers close after flow disturbances, and in the risers again after eight diameters of straight run. The goal of this study is to demonstrate that

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products